Search:

Type: Posts; User: Ernie Nemeth; Keyword(s):

Search: Search took 0.08 seconds.

  1. Re: Attack on the US Power Grid Starting 8 November 2023

    Problem is, that those large transformers are not available in some warehouse. They have to be manufactured.

    So if you knock out enough of them it would take years to build replacements.

    That...
  2. Re: Attack on the US Power Grid Starting 8 November 2023

    It is said that a dozen or so coordinated into a unit could easily bring down the USA by simultaneous attack on its infrastructure.

    Now consider that by conservative estimates there are tens of...
Results 1 to 2 of 2