Re: Turmoil in Ecuador
Alexis Sánchez Miño
Translated from Spanish
🤦🏻♂️🤦🏻♂️🤦🏻♂️ this collectible dummy says: … “what in a normal year we see 20… 25 per day, this year we're seeing 60..65 per day ?.. 😱😱
? What are we seeing per day ?… lightning bolts, loaves of bread, potatoes, rays or what ? 🤔🤔
This dimwit is so ignorant and limited that he doesn't even know what he's saying 🤦🏻♂️🤦🏻♂️…
! The rain that falls has units of measurement … He probably meant to say 20 or 25 millimeters ( mm) of rain !.. 😳
I'll explain it to the jackass who's governing (hopefully he gets it): one mm of rain equals one liter of rainwater that has fallen on a flat surface of one square meter...🤔..? got it dummy ?.. 🤔
Well … what to expect from asking for pears from the elm tree …🤔🤔
https://x.com/AlexisSanchezEC/status...27813635383469
Alexis Sánchez Miño
Translated from Spanish
Which idiot was it who, in the presidential debate, said that #Ecuador has no generation problems? ..😱..
Wasn't it the same moron who said that very day he'd have a solution to the energy problems in three months, and three years later, nothing? .. 🤦🏻♂️
Wasn't it the same jackass who, through his crony ministers, contracted 241 MW with PROGEN and ATM to be installed in 90 days (two years ago), and all we got was a colossal THEFT of over $170 million? .. 🤬
Yes... it's the same one who thinks Ecuadorians are idiots, morons, and jackasses, when not all of us are—just those who keep believing in this ignominious and repulsive tyrant
Translated from Spanish
🔵 #Televistazo ⚡🗣️ During the start of the electricity crisis, the country's thermoelectric power plant operated at full capacity and, until this morning, has been covering 27% of the national energy demand. At the governmental level, the Ministry of Energy holds Celec and@
https://x.com/AlexisSanchezEC/status...81848202486028
Alexis Sánchez Miño
Translated from Spanish
ENERGY CRISIS 2026
October 13 Report
🚩 The Mazar power plant stopped for the 2nd day🤔, and what will be achieved today will be a level of 2125.30 masl; that is, 30 centimeters higher than yesterday's level! Because the inflow is 30 m³/s 😱😱 (1/5 of what's needed). We're still 10.5 m from reaching the minimum operating level!🤔
🚩 What happens when the Mazar power plant stops its turbines to recover the reservoir level?..🤔🤔… because the entire Paute system depends on this reservoir! 😳. If Mazar stops, the Paute-Molino and Sopladora power plants don't receive that turbine-generated water, which are operating under CRITICAL conditions (the Amalusa reservoir has already reached its minimum rational operating level), and they could collapse at any moment if they keep operating with Mazar stopped! 🤔
🚩 Today's demand (until 20:00) was 4900 MW and the peak maximum demand exceeded 5200 MW, meaning there's no reduction in consumption as expected despite the industrial blackouts! 🤔
🚩 The dry season will extend for at least three more months, it's IMPOSSIBLE to recover the Mazar level, and what the government is doing is thrashing around like a drowning person. It would be more rational to start with scheduled cuts and not expose the national energy system to TOTAL COLLAPSE, which would be a national tragedy with colossal consequences!.. 😱😱
🚩 Free advice: If you're trying to hold off the crisis without scheduled blackouts for the entire population until the elections, I've got some terrible news for you. IT'S NOT POSSIBLE. Blackouts are INEVITABLE and UNDELAYABLE!..😳😳, if you don't do it, the alternative is the total collapse of the turbines due to cavitation, abrasion, and more fatal technical consequences from operating them at levels below the minimum operational ones!.. 😱😱
🚩 You've been warned 👁️👁️
https://x.com/AlexisSanchezEC/status...77892747379184